Blown454ss
Well-known member
- Joined
- Feb 16, 2014
- Messages
- 53
Need some help figuring this out. I've had a lot of rain here lately so the soil is soft. I've use the skid steer to scrape it down around a foot. I got around 3 ton of sand to pack in around the edges of the footings. I may rent a roller/******** to pack it even more. I'm going to use crushed concret but i don't know what sizes to get and how to layer them. Any help would be great. I'm trying to do the whole process myself