DanielVetpath
Well-known member
- Joined
- Sep 14, 2011
- Messages
- 89
Hi folks: I recently bought a decades old commercial building to use as shop space. The ceiling is open and the construction includes steel joists. The existing subpanels are pushmatic fed by three wire SER cable threaded through the joists. The main service panel was upgraded to a Square D 200 amp service. The electrician tied in the existing subpanel cables, each to a 100 amp breaker. I am starting to replace the subpanels as I work my way through the building. The run to the first subpanel I want to replace is 80 feet. What size cable should I use (assume aluminum) and can it be SER or should I use MC or something else as it runs through the exposed joists? Thanks for any insights. Daniel 