I have a detached pole barn that I am installing a subpanel into. Running 100Amp feed to the barn through 2-2-2-4 Aluminum wire. The inside of the barn will be finished eventually with 3/4" plywood 4ft from the floor and steel above that. I want to recess the subpanel in the wall and create an open cavity that is 10inch wider than the subpanel all the way around. The garage will be wired with NM wire which will reside behind the walls.
My question is will the NM cable being exposed for 10inches between the metal sub panel and the divider for the wall be a code violation? The wire will be stapled to the plywood the panel is mounted to and will run into the wall through holes in the plywood. Does all of the NM cable need to be buried in the wall or will this mall amount around the panel still meet inspection?
My question is will the NM cable being exposed for 10inches between the metal sub panel and the divider for the wall be a code violation? The wire will be stapled to the plywood the panel is mounted to and will run into the wall through holes in the plywood. Does all of the NM cable need to be buried in the wall or will this mall amount around the panel still meet inspection?