Can i install a sub panel and use one of the recepetacles to feed a spider box? and off the spider box I will run a 220 welder, plasma cutter, and other tools > 120? Compressor will be hardwired into the main panel.
Siemens TL137US Talon Temporary Power Outlet Panel with a 20, 30, and 50-Amp Receptacle Installed, Unmetered & Q120 20-Amp Single Pole Type QP Circuit Breaker
Thank you in advance.