Prophet455
New member
Building another garage adjacent to the existing garage. The existing garage has a 200 amp service coming from a separate meter pole and box outside. The meter box itself has 4 breaker slots open because it’s main breaker feeds straight to the service entrance wires for the original building. Because the new shop is in the opposite direction of the existing shop from the meter pole, I think it would be advantageous to run from the meter box instead of sub paneling off the main panel in the existing building. Considering running a 125 amp breaker with 2/0 alum cables underground in conduit to the new shop about 100 ft away to its own 125 breaker panel inside. Not sure if this is considered a sub panel or dual service but hopefully you get the idea. Question #1- Is there any code issues so far? Next do I run 3 or 4 wires to the new building-as I understand if this is considered a sub panel I will have to separate ground and neutral but if it’s not- I run a neutral but set a ground rod at the new building. If I have This completely butchered, please help clarify what needs to be done and best options to meet codes/safety.
Thanks
Thanks