joeyv69ragtop
Active member
Hi All,
getting a hole dug to get ready for a thickened edge floating slab.
The land slopes and i want the pad 3" above grade at the high side which puts me a bit more than 3" on the low side.
I'm clearing all the sod before putting down minimum 4" of crusher run.
The issue is that taking out the sod on the low side of the grade is putting me lower than i need to be for the 4" of gravel and the pad on top.
is it okay to have thicker gravel on one side of the pad and work my way down to 4" of gravel on the high side or should i dig the whole area level with the lowest spot and use more than 4" of gravel the same thickness the whole way?
Thanks!
getting a hole dug to get ready for a thickened edge floating slab.
The land slopes and i want the pad 3" above grade at the high side which puts me a bit more than 3" on the low side.
I'm clearing all the sod before putting down minimum 4" of crusher run.
The issue is that taking out the sod on the low side of the grade is putting me lower than i need to be for the 4" of gravel and the pad on top.
is it okay to have thicker gravel on one side of the pad and work my way down to 4" of gravel on the high side or should i dig the whole area level with the lowest spot and use more than 4" of gravel the same thickness the whole way?
Thanks!