Im getting a pad poured for a carport beside my house this weekend.. But i have 1 problem. I have well water and the supply line runs to my house right where im getting the slab poured. What are some ways to go about installing the slab here? run pipe deeper under slab, reroute? Heres a picture to kind of explain what im talking about excuse the junk its getting hauled off along with that shed before they do the slab. My well would be on the left side of the picture in the front yard.