My panel is at one end of the shop and I need to run circuits up into the attic, down the attic and then turn 90 degrees run across the attic and drop down the walls to the outlets, disconnects, or whatever. I will have 12 gauge, 10 gauge, and maybe some 8 gauge romex cables to run in the attic for these ciruits. There will be long runs that are parallel to the ceiling joists which are 2 feet apart. Every four feet I have a flat 2x4 that runs perpendicular to the long wire runs.
My question, since I can't nail all the circuits to one joist, how often must a cable be supported when running in free air parallel to the joists. I know I can go two feet but how about 4? There will be a ceiling at some point and this will be inspected.
My question, since I can't nail all the circuits to one joist, how often must a cable be supported when running in free air parallel to the joists. I know I can go two feet but how about 4? There will be a ceiling at some point and this will be inspected.