I'm putting down my epoxy floor coating this weekend. I will be using two different colors. Here's my thinking on a technique to tape off the two areas.
First, I plan to use scotch blue painters paint since it doesn't leave any residue. Next I went online and found some specs on this tape. I found out that it is 7.9 mils thick. The coating I will be putting down is supposed to yield a 20 mil thickness. Mine will probably be a little thicker since I ordered a little more to make sure.
So here's my tape plan. I'll first lay out my tape to seperate the two colors. Using a putty knive I'l run the edges just to make sure they have good contact with the floor. Next I'll take another piece of tape and overlap the first piece about 1/2". I'll do the same with two more layers giveing me a total of four layers of tape. Then I'll use a stratight edge and a good single edge razor blade to trim the tape based on the first piece of tape I put down. I'll then run the edges one more time to make sure all edges are smooth.
I figure thie should give me about a 32 mil thick "dam" for the epoxy to pool up against as it self levels. Then when I put down my second color the thickness of the first will give it a place to level too. Of course I'll still tape along the edge of the first color to prevent over run.
Does this make sense and sound like a good plan of attack ???
First, I plan to use scotch blue painters paint since it doesn't leave any residue. Next I went online and found some specs on this tape. I found out that it is 7.9 mils thick. The coating I will be putting down is supposed to yield a 20 mil thickness. Mine will probably be a little thicker since I ordered a little more to make sure.
So here's my tape plan. I'll first lay out my tape to seperate the two colors. Using a putty knive I'l run the edges just to make sure they have good contact with the floor. Next I'll take another piece of tape and overlap the first piece about 1/2". I'll do the same with two more layers giveing me a total of four layers of tape. Then I'll use a stratight edge and a good single edge razor blade to trim the tape based on the first piece of tape I put down. I'll then run the edges one more time to make sure all edges are smooth.
I figure thie should give me about a 32 mil thick "dam" for the epoxy to pool up against as it self levels. Then when I put down my second color the thickness of the first will give it a place to level too. Of course I'll still tape along the edge of the first color to prevent over run.
Does this make sense and sound like a good plan of attack ???