bmxdad
Well-known member
I wondering what the floor or air temp needs to be before adding a sealer. Winter is coming, so do I wait till spring, or a good day and try heating the garage up?
My plan is to wash and etch with Muriatic acid in a 1-5 solution, rinse, dry and roll on the as many coats of sealer as I can get out of 5 gal. Dry time is a couple hours between coats ... so a two day process.
IF ... I have the proper temperature range.
My plan is to wash and etch with Muriatic acid in a 1-5 solution, rinse, dry and roll on the as many coats of sealer as I can get out of 5 gal. Dry time is a couple hours between coats ... so a two day process.
IF ... I have the proper temperature range.
