I am waiting for 50+ degree temperatures in order to prime then epoxy my prepped garage floor.
What is the consensus regarding application temperature?
The next few days will be highs of @55 degrees, but lows down to 40s in the evening.
As I am doing a garage, I assume the temperature in there will be higher than the outside air temperature. Can I get away with applying @noon when the temp is @50+, assuming it will cool below 50 after @4pm?
Thanks