Well-known member
Hi Guys
New building is up, inspected, keys in hand & check was written. Now I have to finish the inside.
I have a 30 x 40 with 12 foot walls. I want to finish the interior during the winter. I will insulate it and apply OSB wall. After that, the electrical will be surface mount emt. I plan on a number of light circuits (3or 4?) to allow "just enough" lighting as needed. I will have a couple of 120 volt outlet circuits as needed as well as a couple of 220 volts for, lift, welder, Bridgeport and lathe.
But, for now, what is the recommended method to pull temporary power from the main box in the house to the detached building approximately 100 feet away? I am competent with electrical, I have done wiring for myself and will call in an expert when the time comes. Can I / should I make a heavy duty extension cord to a dedicated breaker feed in the main box? Plug in to the main box (via receptacle)when working, unplug and store otherwise. On the other end, a load center temporarily mounted in which I can provide simple light and power receptacles from? I am also considering a generator instead of a house hook up. Just getting opinions first, don't want to waste money or time.
Thanks for looking.
New building is up, inspected, keys in hand & check was written. Now I have to finish the inside.
I have a 30 x 40 with 12 foot walls. I want to finish the interior during the winter. I will insulate it and apply OSB wall. After that, the electrical will be surface mount emt. I plan on a number of light circuits (3or 4?) to allow "just enough" lighting as needed. I will have a couple of 120 volt outlet circuits as needed as well as a couple of 220 volts for, lift, welder, Bridgeport and lathe.
But, for now, what is the recommended method to pull temporary power from the main box in the house to the detached building approximately 100 feet away? I am competent with electrical, I have done wiring for myself and will call in an expert when the time comes. Can I / should I make a heavy duty extension cord to a dedicated breaker feed in the main box? Plug in to the main box (via receptacle)when working, unplug and store otherwise. On the other end, a load center temporarily mounted in which I can provide simple light and power receptacles from? I am also considering a generator instead of a house hook up. Just getting opinions first, don't want to waste money or time.
Thanks for looking.