Termite spray before Slab pour

ddurrett896

Well-known member
Joined
Mar 29, 2015
Messages
995
Location
VA
In south Eastern VA termites can get bad and my bug guy recommended Pre treating the ground before pouring the slab.

I use Talstar pro to treat permitted throughout the year. Will that work or do you have a better recommendation? Thanks
 
To avoid these ads, REGISTER NOW!

aka Larry

Well-known member
Joined
May 2, 2012
Messages
8,111
Location
Eastern, NC
My buddy's county inspector said he MUST HAVE termite protection before his new building could be erected. The lady at the permit office couldn't understand why he balked at the mandate because his building is STEEL!:shocking:
 

ransil

Well-known member
Joined
Jul 22, 2018
Messages
313
Location
pa
something with Fipronil greater than 9 %
Taurus SC was last I used
 

Samh

Well-known member
Joined
Aug 16, 2006
Messages
482
Location
Canton GA
I thought the thinking was treating under the slab eventually doesn't make a difference when it comes to re-treat. Unless you are planning on drilling slab. I would think going around the outside would be sufficient.
 
To avoid these ads, REGISTER NOW!

JimNC

Well-known member
Joined
Jul 9, 2017
Messages
580
Location
NC
Taurus SC is good stuff. For retreat, drill and inject around the inside perimeter and trench around the outside perimeter. As I recall, instructions say retreat every 10 years, I do it every 5 or 6 in NC mostly because the grading around the house is not perfect.

It seems logical to me that you’d treat any cracks in the slab, so I do, but most do not.

I’ve heard that there is a specific size sand that subterranean termites can’t dig through, haven’t had an opportunity to figure out how to take advantage of this.
 

randyandrewsberg

Active member
Joined
Oct 20, 2016
Messages
33
I use Talstar P mostly for pretreat under slab, the label spells out how to use it, makes sure you calibrate your spray equipment to deliver the right amount. More is not better, but you don't want to miss anything. It requires some hand holding with the GC to apply the day before the cement truck show up to pour, but that's how I like to do it. Indiana requires licensing and notification to the State Chemist for pretreat, but not for conventional post construction treatment, you might check out your states pesticide agency for any hoops to jump through. Occasionally I'll use Termidor HE with a trench around the building after grade is done, it works wonderfully and is chemically stable longer than the Talstar, but is a top shelf product and can cost more depending on the footprint of the building.

Sent from my XT1635-01 using Tapatalk
 

HenryAZ

MEMBER EMERITUS
Joined
Sep 18, 2012
Messages
1,054
Location
South Congress AZ
We pretreated before the pour, but also before the pour had perforated tubing laid down, terminating in 3 hose connections in one end of the stem wall. Now we can have the bug man saturate under the slab at any time. We do about every 3 years. Takes about 80 gallons of Termidor. This being AZ, the Termidor application brings up some very large and scary looking creatures, like this Giant Desert Centipede. This guy was actually a full 9" long, but took 1.5 cans of wasp and hornet spray before this pic was taken.

GiantDesertCentipede.jpg
 

flan

Well-known member
Joined
Feb 3, 2016
Messages
427
We pretreated before the pour, but also before the pour had perforated tubing laid down, terminating in 3 hose connections in one end of the stem wall. Now we can have the bug man saturate under the slab at any time. We do about every 3 years. Takes about 80 gallons of Termidor. This being AZ, the Termidor application brings up some very large and scary looking creatures, like this Giant Desert Centipede. This guy was actually a full 9" long, but took 1.5 cans of wasp and hornet spray before this pic was taken.

GiantDesertCentipede.jpg

Another reason I will suffer with high taxes, traffic and cold weather in the northeast!!!:lol_hitti
 