The upstairs is still only roughed out but has a master bedroom suite including a library, gym, bistro breakfast area, master bath, bedroom, his and her closets (his with false wall in the rear leading to gun storage)

All plumbing and electrical is roughed in. Now that we are weather proofed outside, it is time to the inside work. I have a bunch of building the garage pic in an album in on the site. Not sure how to link to anything though.