Last night is making today much tougher, I feel like I am in recovery, had about 20 hours into that day, guess that means I did two days work in one day?
I am at the Hill, but everything and I mean everything that I would like to do has some missing component. I am startign to make a list on things that are annoying and need to be fixed or replaced, the list is growing exponentially. I am also trying to get a handle on my current project list, but based on what I have for parts in stock, so I don't have to wait or spend more money before getting something checked off the list. The last six months have been a budget's worst nightmare, I NEED to curb things or nothing will get done. My priorities change based on what emergency is happening at the moment, I would like to stop that situation as well, I know emergencies will pop up, but having them a daily or multiple times daily occurrence is getting ridiculous. One thing I am noticing, I do not have a separate list for things that I can do by myself versus things that need another set of hands or someone with a different skill set than I have. Doing that may help keep things in check a bit better, the last week the office has suffered a bunch and now I have four tower lease amendments tossed my way on top of the boat to pick up for Dad and the newest emergency (actually old news) the gate at the tower site. Dad called me and tolled me to just drop everything and do the gate, then he told me just to go buy a cheap one from Tractor Supply and slam it together. I basically told him no way, then I ordered $2500 worth of square tube, $1000 worth of bearings, and I cut up two of his solid 3 1/4" diameter tower legs. I hope to have it mocked up next week, not sure if I am getting it galvanized or just painting it, I want to get it galvanized, but time is always against me. I may be able to get the steel taken down by another tower company, they make trips fairly regularly. It would be awesome if I could coincide it with picking up the boat, but timing wise it just can't happen.
The Muv-All trailer needs all the rams rebuilt, at least one has damage to the rod, so it will need to be fixed or replaced for sure. I can't tear the trailer apart until I get all the things moved around, so that means it needs to survive until the end of September or later. I have the excavator over at the tower site, need to get the gate posts installed and two sheds demolished, probably going to need to move some gravel as well, we put a "temporary" road in during the tower removal so that one of the buildings could be hauled out on a lowboy, but the road is so much nicer, we left it, I am pretty sure the town will tell me to pound sand and remove it. I do not think I can convince my Aunt that runs the two Trusts (technical tower owners) to spend more money on site plans and water runoff, so I am thinking to just preemptively remove it and haul the dirt to the Salvage Garage, will be useful there anyways. I have a lot of moving parts (when don't I?), just been a bit more of a struggle lately, at least the days haven't been as humid and hot.
On another note, the bed cooler thingy finally arrived, it is excellent, not cheap, but anyone that is a hot sleeper would be amazed at how well it works. I have the ceiling fan off, the AC is dialed back a bit and I am sleeping with a blanket all night. If I end up on my side, when I get into the shower, one half of my body is so much cooler than the other side that the hot water feels hotter on half of me.