I was going to wait until the garage is complete to start a thread but figured I would go ahead and post my progress and I can always add to it later. I've titled it the Supratruck garage after my website, Supratrucks.com. Over the past few years, I've built several Toyota pickups with Supra turbo engines and the name kinda stuck. Now, on to the good stuff. Basically, it's a 24'x32' with 14' ceilings. I wanted the extra ceiling height for the lift that is coming once the concrete is poured. I chose to have a door put in the upstairs and have stairs built up to the door instead of a pull down door inside. The thought of climbing those flimsy pull downs scared me enough to spend the extra bucks. I think I made a good decision. As it stands today, it is complete except for concrete, insulation and interior wall covering, wiring, guttering, and installing the garage doors and openers. The guys building the garage for me finished what you see in eleven days. Some days they only worked 4-6 hours because of the mid-ninety heat and high humidity. All in all, I'm pretty happy with how it's turned out so far. I'll post pictures to show the day by day progress starting with day one:
Day one, footing dug and poured
Day two, block laid
Day three, four walls up
Day four, osb up
Day five, trusses
Day six, osb on the roof
Day seven, roofing and eaves
Day eight, partial wrap and more eave work
Day nine, eaves done, some vinyl and door installed
Day ten, vinyl nearly finished, front window installed, some work on rear stairs
Day eleven, carpenters are finished with their part. Now for concrete, garage doors, and all the other work that I have to do myself. I'll update as I go along.
I couldn't resist pulling a car in
The 12'x32' room upstairs still needs flooring
The door and stairs at the rear of the garage
View from the house, I have shutters ordered for the upstairs window but they haven't came in yet
That's about all I have for now. More updates to come later. Thanks for looking.
Day one, footing dug and poured
Day two, block laid
Day three, four walls up
Day four, osb up
Day five, trusses
Day six, osb on the roof
Day seven, roofing and eaves
Day eight, partial wrap and more eave work
Day nine, eaves done, some vinyl and door installed
Day ten, vinyl nearly finished, front window installed, some work on rear stairs
Day eleven, carpenters are finished with their part. Now for concrete, garage doors, and all the other work that I have to do myself. I'll update as I go along.
I couldn't resist pulling a car in
The 12'x32' room upstairs still needs flooring
The door and stairs at the rear of the garage
View from the house, I have shutters ordered for the upstairs window but they haven't came in yet
That's about all I have for now. More updates to come later. Thanks for looking.