Been a member for awhile and really enjoy looking at all the variety in the builds. It’s interesting to see the different styles and methods that are used in areas around the globe.
I decided to finally dig up what few pictures that I have from when we built our shop. The original plans where to build a 30x30, but when they came out and staked out the location of the foundation my wife didn’t like it. After questioning her about it, she said it was just to square she didn’t like it. Then I found out that I have the best wife ever when she asked what the size I really wanted was. I told her half joking 40x60 expecting to get rejected and we could meet in the middle. She asked the guys to lay it out so she could see it. They put a stake at each corner and ran string around it for her inspection. She looked at it said “I like it, that’ll work” and told them to form it up. The concrete was laid in the spring of 2009 (sorry no pictures of this step).
The building was started in February of 2011 after saving up additional funds for larger building and the concrete budget being blown out of the water by more than doubling its size.
Trusses delivered (wife's brother inspecting shipment)
Setting trusses
Framing and trusses done
I decided to finally dig up what few pictures that I have from when we built our shop. The original plans where to build a 30x30, but when they came out and staked out the location of the foundation my wife didn’t like it. After questioning her about it, she said it was just to square she didn’t like it. Then I found out that I have the best wife ever when she asked what the size I really wanted was. I told her half joking 40x60 expecting to get rejected and we could meet in the middle. She asked the guys to lay it out so she could see it. They put a stake at each corner and ran string around it for her inspection. She looked at it said “I like it, that’ll work” and told them to form it up. The concrete was laid in the spring of 2009 (sorry no pictures of this step).
The building was started in February of 2011 after saving up additional funds for larger building and the concrete budget being blown out of the water by more than doubling its size.
Trusses delivered (wife's brother inspecting shipment)
Setting trusses
Framing and trusses done