I am having a slab poured for my 20x22 shop next week. going with rebar grid and fiber mesh. I have searched and what I can tell, I need to keep the top moist/damp after the initial pour, but how long do you wait to start wetting it? it looks like it might be 95 degrees the day of the pour as of now. I am not doing the work, but I know from reading I have to do some "early maintenance" to keep it from cracking alot during the drying process.
any other tips are welcome, thanks in advance.