drivesitfar: Correct, it was in my possession around middle of August, 2017 when I started moving my stuff in. The developer's role (and whatever I've added) is complete, MINUS the developer's plumber finishing the steam shower fixtures after tile guys. But everything you see now, it'll be on me.
September 21, 2017, 3:30am
Started the day not expecting to stop in the warehouse tonight, but just the twist of events ended up there after midnight, thought I'd update here.
So earlier in the day, got asked to fill in for a hockey (fun) league for a 11pm game. Initially, stayed home, packed some stuff, got text from tile guys saying tiling's complete that they'll grout tomorrow and see if I can meet up and finish paying them. (hence didn't feel like going up today)
But after hockey, it was 12:30-1:00am, and I was only 11 mins away from the warehouse from the arena lol, so why not.
I'm so happy with these guy's (two brothers) work, since I'm only a one off customer (I'd get tile work maybe once every 5-7 years, not like I'm a G.C. that has a huge list of good and bad subcontractors)
Too bad the photos doesn't show the silver sparkles in the granite
Also last week built some more simple shelves on the industrial racks. I'd like (to think), I'm a minimalist and keeping things clean and simple.
September 21, 2017, 3:30am
Started the day not expecting to stop in the warehouse tonight, but just the twist of events ended up there after midnight, thought I'd update here.
So earlier in the day, got asked to fill in for a hockey (fun) league for a 11pm game. Initially, stayed home, packed some stuff, got text from tile guys saying tiling's complete that they'll grout tomorrow and see if I can meet up and finish paying them. (hence didn't feel like going up today)
But after hockey, it was 12:30-1:00am, and I was only 11 mins away from the warehouse from the arena lol, so why not.
I'm so happy with these guy's (two brothers) work, since I'm only a one off customer (I'd get tile work maybe once every 5-7 years, not like I'm a G.C. that has a huge list of good and bad subcontractors)
Too bad the photos doesn't show the silver sparkles in the granite
Also last week built some more simple shelves on the industrial racks. I'd like (to think), I'm a minimalist and keeping things clean and simple.
