I have this 2 1/2" conduit LB that I need to setup to get into my basement. The siding starts where the concrete ends. As you can see from the picture If I use the LB thats made for this then the penetration will be too high.
A few questions: Can I forgo expansion pipe and just put the LB onto the 90 elbow?
If and when I do that is it ok that half or part of the LB is under ground? If no to these then the only other thing I can think of doing is adding another 90 and having the LB sideways instead of up and down. Thoughts on that?
Thanks!