After reading all the posts about porcelain tiles over the last 6 months,I've decided that that is the route I'm going for my garage.
It is a large 2 car attached garage, about 730 sqft. I don't have any pictures yet as we don't move into the house until the middle of October. It's a new house but by then the concrete will be about 9 weeks old. It was power troweled smooth and has a few control cuts in it. We are in the country so we have a 5,000 gal cistern under the floor in one corner.
So almost all my questions have been answered in other posts but I have a few more and would also appreciate any feedback if I'm missing something.
There is a wooden step going into the house that would be nice to have tiled. Should I pour a concrete step and tile it? Other ideas?
Is it safe to just tile over the cuts? I'll be using the Kerabond/Keralastic thinset. Do I need to line up the tile with the cuts? If so, how do you hit all the cuts?
Is November too late to tile? I'm in Ontario, Canada so it may get close to freezing at night. Should I wait until spring? I don't want salt and **** wrecking the floor before I get tile down.
Any special considerations for the area above the cistern?
Thanks
It is a large 2 car attached garage, about 730 sqft. I don't have any pictures yet as we don't move into the house until the middle of October. It's a new house but by then the concrete will be about 9 weeks old. It was power troweled smooth and has a few control cuts in it. We are in the country so we have a 5,000 gal cistern under the floor in one corner.
So almost all my questions have been answered in other posts but I have a few more and would also appreciate any feedback if I'm missing something.
There is a wooden step going into the house that would be nice to have tiled. Should I pour a concrete step and tile it? Other ideas?
Is it safe to just tile over the cuts? I'll be using the Kerabond/Keralastic thinset. Do I need to line up the tile with the cuts? If so, how do you hit all the cuts?
Is November too late to tile? I'm in Ontario, Canada so it may get close to freezing at night. Should I wait until spring? I don't want salt and **** wrecking the floor before I get tile down.
Any special considerations for the area above the cistern?