I have a small two car garage that I'm preparing to update. I want to tile and I'm leaning towards VCT.
I have a 3.5" high step (for lack of a better term) that goes across the entire back wall. It extends 24" from the wall.
My question is, how have you guys handled steps and ledges like this? Tile the top and use rubber base on the front? I'm just wondering how the edge is handled.
I may just say screw it and go with quarry tile.
I have a 3.5" high step (for lack of a better term) that goes across the entire back wall. It extends 24" from the wall.
My question is, how have you guys handled steps and ledges like this? Tile the top and use rubber base on the front? I'm just wondering how the edge is handled.