hbus1300
Active member
Finally got the time to put down my Ghostshield Lithi-Tek 4500 Densifier and will be doing the 8510 sealer after.
What would be the recommended length of time from applying the densifier to applying the penetrating sealer?
This is from their application instructions
"Typical drying time is 4-6 hours at 70°F and 50% relative humidity.
Cooler temperatures or higher relative humidity can extend the
drying time. Treated surfaces will be ready for pedestrian and vehicle
traffic within 24 hours"
Doesn't really talk to the application of sealer over it. I'd like to get that down asap, but also do not want to rush the process if there is more to be gained from letting the densifier sit before applying sealer.
What would be the recommended length of time from applying the densifier to applying the penetrating sealer?
This is from their application instructions
"Typical drying time is 4-6 hours at 70°F and 50% relative humidity.
Cooler temperatures or higher relative humidity can extend the
drying time. Treated surfaces will be ready for pedestrian and vehicle
traffic within 24 hours"
Doesn't really talk to the application of sealer over it. I'd like to get that down asap, but also do not want to rush the process if there is more to be gained from letting the densifier sit before applying sealer.
