AA7483
Well-known member
I built my pole barn a few months ago. Concrete has been done for about 6 weeks now. This is going to be a general purpose shop. I'll be doing some metaworking/welding as well as storage for my HVAC business. General woodworking and I'll also have a small office. The floor has been power troweled. I'm hoping to get away with just acid etchiny and not having to grind. Something easy to put down and somethjng that will hold up.
Thanks
Thanks

