Well, most all of the construction is finished on the garage/apartment. I've got a free weekend so am finally planning on laying down the TL37 and Ghost Shield. So far the guys have kept the slab very clean except for some small drops of resin that the framing has dripped, but those spots should come up easily.
The slab is virgin so does not really need any "cleaning" except a good vacuuming(I have a large exterior walk behind vac). Should I bother with light pressure washing or is that just a waste of time?
My main question is how much time should I wait between the application of the two products? The data sheet says wait 24 hrs before walking on it.
Thanks for any comments.
This is the place. The approach is dry now. All the junk is out.
https://goo.gl/photos/xfyPKdekXdHPswyt6
The slab is virgin so does not really need any "cleaning" except a good vacuuming(I have a large exterior walk behind vac). Should I bother with light pressure washing or is that just a waste of time?
My main question is how much time should I wait between the application of the two products? The data sheet says wait 24 hrs before walking on it.
Thanks for any comments.
This is the place. The approach is dry now. All the junk is out.
https://goo.gl/photos/xfyPKdekXdHPswyt6