I had my 40x40 slab poured a year ago with 3500psi concrete. It's a 4" slab that has a 12"X24" beam around the perimeter and 12"x18" beams running N-S and E-W across the middle. The contractor did not install control joints, expansion joints, nothing.
In my area I have never seen any joints cut or troweled into the house slabs that I've seen poured. And for another example, even our 15 year-old house slab with an attached 26x36 garage has no joints in it. So when I asked about having joints made in the shop slab and the contractor said it wasn't necessary, I took it as sound advice.
Anyways, the new lab sat uncovered last year for 6 weeks and we had torrential rains over that entire time span. I can only imagine that helped the concrete to cure as well as possible. The building has been up for almost 10 months now and still no surface cracks. There are some very tiny surface hair lines, but nothing too concerning at this time.
Questions are:
Should I consider cutting some 1" deep joints every 10x10 feet?
Is it too late for control joints at this point?
Would I degrade the slab if I cut them this late in the game?
Since I haven't seen any surface cracks yet, a year later, is my slab in the clear?
Please consider my location, SE Texas, very muddy clay on flat flat land. There is very little if any at all ground shifting around here.
I had my 40x40 slab poured a year ago with 3500psi concrete. It's a 4" slab that has a 12"X24" beam around the perimeter and 12"x18" beams running N-S and E-W across the middle. The contractor did not install control joints, expansion joints, nothing.
In my area I have never seen any joints cut or troweled into the house slabs that I've seen poured. And for another example, even our 15 year-old house slab with an attached 26x36 garage has no joints in it. So when I asked about having joints made in the shop slab and the contractor said it wasn't necessary, I took it as sound advice.
Anyways, the new lab sat uncovered last year for 6 weeks and we had torrential rains over that entire time span. I can only imagine that helped the concrete to cure as well as possible. The building has been up for almost 10 months now and still no surface cracks. There are some very tiny surface hair lines, but nothing too concerning at this time.
Questions are:
Should I consider cutting some 1" deep joints every 10x10 feet?
Is it too late for control joints at this point?
Would I degrade the slab if I cut them this late in the game?
Since I haven't seen any surface cracks yet, a year later, is my slab in the clear?
Please consider my location, SE Texas, very muddy clay on flat flat land. There is very little if any at all ground shifting around here.