I have an electrician coming to install a transfer switch for a portable generator. The switch is an APC UTS10Bi.
Now, the problem is that we have essential circuits in two breaker boxes that are side by side. The electrician said that it would be easier if I could just choose one box for the portable generator to power, but how difficult is it to power circuits from both breaker boxes? There will be a county inspector, so I suspect everything must be done to code. Is there anything that I should look out for?
Thanks
Now, the problem is that we have essential circuits in two breaker boxes that are side by side. The electrician said that it would be easier if I could just choose one box for the portable generator to power, but how difficult is it to power circuits from both breaker boxes? There will be a county inspector, so I suspect everything must be done to code. Is there anything that I should look out for?