Denwood
Well-known member
In the bottom sketch you see a typical truss. The filled in areas are where the new plywood profile was created, with original webbing cut away, and the bottom profile filled in with 2x6 framing. If you walk into our studio space now, you look up and see an 11ft vault. I likely have video/still frames of the process and can post a few if you're interested. The important point is that if you run your new pitch framed with 2x6, and fully clad both sides, glue screw etc, it will be strong.
Last edited:
