roll_the_dice
Well-known member
I got my 10x12 Tuff Shed installed Monday. It is going to be used for dirty work...ie media blasting, powder coating, a little woodworking, and I am going to build a small paint booth also, etc... I am sure space will run out quickly. i am supposed to meet with the electrician later today for power couple of 230v connections for air compressor and powder coating oven and 5-6 regular outlets on the walls and ceiling as well as lighting. Going to have a breaker box in the shed for ease of use.
It was fun watching them put it together...like large legos...here are a few of the process.
Since I live in a hurricane zone, there are 3 foot auger bolts in each corner and attached through the shed. They are supposed to withstand 150 MPH winds...the roof won't but the entire building won't become a projectile.
It was fun watching them put it together...like large legos...here are a few of the process.
Since I live in a hurricane zone, there are 3 foot auger bolts in each corner and attached through the shed. They are supposed to withstand 150 MPH winds...the roof won't but the entire building won't become a projectile.