Designated Dave
Well-known member
#1, I'm located in mid-michigan and just finished the shell of my 24x32 barn. If I was to heat the inside of the barn to get the frost out of the ground, and finish bringing in the sand i need, would it be all right to pour the concrete floor as long as I kept it above freezing in the barn?
#2 If I have all sand in place, lines chaulked around the perimiter for slab height, welded wire mesh set in place w/ visqueen barrier under that, and form across the overhead door, what would I be looking at cost wise to have it poured and finished? (going w/ 4" slab and about a 16" deep section just across the door) AND, if theres anyone in the area interested in doing it could I get a quote? (also, I can cut the releif joints in afterwards, I have access to a walk behind saw.)
Thanks, Dave
#2 If I have all sand in place, lines chaulked around the perimiter for slab height, welded wire mesh set in place w/ visqueen barrier under that, and form across the overhead door, what would I be looking at cost wise to have it poured and finished? (going w/ 4" slab and about a 16" deep section just across the door) AND, if theres anyone in the area interested in doing it could I get a quote? (also, I can cut the releif joints in afterwards, I have access to a walk behind saw.)
Thanks, Dave
Last edited: