They will be pouring the slab for my shop soon and I am working with the inspector as I will be doing my own electrical. He suggested to me to do a Ufer ground instead of driving in rods. He told me to get 20 feet of #4 stranded copper and tie it to the re-bar and turn one end up through the concrete to tie to. My question is, they are putting down a vapor barrier for the slab and I am wondering how this will work as a ground if there is a large plastic sheet insulating the slab? Is the area around the side of the slab where there is no plastic enough for the ground? I ask the inspector and he said that according to the code, it would work fine.