Putting down my epoxy-coat last night and have now just realized I used too much hardener on one section (10x10). After 12 hours it is probably 75‰ cured. I can make a dent with my fingernail if I push hard.
Estimate is a 1:1 mix of resin to hardener in this section
I need to get my topcoat down today on the other section so I am thinking I will leave the bad section to see if it continues to cure.
Or, should I just bite the bullet and plan to pull it up and start over (it's too firm to do by hand. Will need to rent a diamabrush scraper)
Estimate is a 1:1 mix of resin to hardener in this section
I need to get my topcoat down today on the other section so I am thinking I will leave the bad section to see if it continues to cure.
Or, should I just bite the bullet and plan to pull it up and start over (it's too firm to do by hand. Will need to rent a diamabrush scraper)
