Have'nt posted any pics in a while so figured I would give an update. I am FINALLY starting to see the light at the end of the tunnel. I started putting the metal up sometime near the end of September and am just now getting ready to close in the third wall!
The roof was a real challenge being an 8/12 pitch, ended up building a beam near the peak when installing the roof on the non lean to side as I had used the purlins for a standing platform while getting the other side down.
The scaffolding was borrowed from my wifes uncle which has been priceless while bucking the ply wood sheeting for the upstairs an installing the gable end siding.
The roof was a real challenge being an 8/12 pitch, ended up building a beam near the peak when installing the roof on the non lean to side as I had used the purlins for a standing platform while getting the other side down.
The scaffolding was borrowed from my wifes uncle which has been priceless while bucking the ply wood sheeting for the upstairs an installing the gable end siding.