I'm planning an upgrade of my garage wiring and have a few questions- currently my garage is all two wire with some GCFI outlets and some ancient old school two wire ungrounded outlets. My electric panel is on the outside of my house which makes it really convenient. The garage wiring travels through a conduit to a mast on my roof, travels across my yard in the air, and then another mast on the roof of my detached garage. My main box for my house was just upraded in 2017 and has an earth ground rod right below the box. Running from the box to the mast is 12 gauge 2 wire which is tied to 6 gauge 2 wire between the masts. Wiring in the garage is a real hodge podge and will be replaced.
Plan: I want to add a subpanel in the garage, with (2) 30 amp 220v outlets for a compressor and welder, then (2) 20 amp 115v circuits for lighting and outlets.
main question- DO I need to run 3 wire between the main panel and the sub panel in the garage, or can I use the existing 2 wire 6 gauge and use an earth ground from the subpanel?
Thanks
Plan: I want to add a subpanel in the garage, with (2) 30 amp 220v outlets for a compressor and welder, then (2) 20 amp 115v circuits for lighting and outlets.
main question- DO I need to run 3 wire between the main panel and the sub panel in the garage, or can I use the existing 2 wire 6 gauge and use an earth ground from the subpanel?
Thanks