ArtisanFarms
Well-known member
I’m going to have a 150 amp panel in my new shop.
To make the connection to my main panel I will have ~85’ run in the basement and ~ 75’ buried to the shop.
Does it make more sense to run URD the entire length and put it in conduit in the basement, or use SER in the basement and have a junction box at the outside wall to tie into the URD going to the shop?
Most of the run in the basement will be in a ~ 2’ x 2.5’ utility chase way with house wiring and plumbing.
To make the connection to my main panel I will have ~85’ run in the basement and ~ 75’ buried to the shop.
Does it make more sense to run URD the entire length and put it in conduit in the basement, or use SER in the basement and have a junction box at the outside wall to tie into the URD going to the shop?
Most of the run in the basement will be in a ~ 2’ x 2.5’ utility chase way with house wiring and plumbing.