Hi all,
So this will be our 4th house that i remodeled in the last 7 years. Some of you guys might have followed my thread in CA with the pre-built home we did.
However, we moved to UT and bought an older home in a great area against the Wasatch mountain range. We will be redoing the whole house. We have another one on the way and we are doing the majority of the work ourselves. Well I will be doing it as my wife is due in December.
The photos I published happened over the course of three weeks, which pretty much brings up today. We took ownership of the home June 7th.
Here are some quick facts are what we are doing that have done:
1. Gutted all flooring and bathrooms.
2. Demo entire kitchen and add a larger pantry.
3. Re-do all flooring with LVP, tile, and carpet.
4. Close up random openings in master and above the fireplace.
5. Close doors up that are not needed, house had ~24+ doors going down to 18.
6. Add exterior patio for Jacuzzi and outdoor space.
7. Add fencing for dog.
8. Build detached garage.
9. Paint, Trim replacement
Current State-
All flooring is removed.
Kitchen cabinets have been set, and are being templated for counter-tops.
All tile has been ordered and will start to be installed coming next couple of weeks
Patio has been rough graded, and small retaining blocks will be delivered shortly.
Pantry has been expanded and drywalled
90% of drywall has been completed and needs final sanding.
As more time becomes available i will explain a little more time discussing what is going on. Feel free to comment and ask questions, I will do my best to get back on items.
So this will be our 4th house that i remodeled in the last 7 years. Some of you guys might have followed my thread in CA with the pre-built home we did.
However, we moved to UT and bought an older home in a great area against the Wasatch mountain range. We will be redoing the whole house. We have another one on the way and we are doing the majority of the work ourselves. Well I will be doing it as my wife is due in December.
The photos I published happened over the course of three weeks, which pretty much brings up today. We took ownership of the home June 7th.
Here are some quick facts are what we are doing that have done:
1. Gutted all flooring and bathrooms.
2. Demo entire kitchen and add a larger pantry.
3. Re-do all flooring with LVP, tile, and carpet.
4. Close up random openings in master and above the fireplace.
5. Close doors up that are not needed, house had ~24+ doors going down to 18.
6. Add exterior patio for Jacuzzi and outdoor space.
7. Add fencing for dog.
8. Build detached garage.
9. Paint, Trim replacement
Current State-
All flooring is removed.
Kitchen cabinets have been set, and are being templated for counter-tops.
All tile has been ordered and will start to be installed coming next couple of weeks
Patio has been rough graded, and small retaining blocks will be delivered shortly.
Pantry has been expanded and drywalled
90% of drywall has been completed and needs final sanding.
As more time becomes available i will explain a little more time discussing what is going on. Feel free to comment and ask questions, I will do my best to get back on items.