I am getting ready to build a post and frame shop soon but before I start drilling holes for the poles I need to figure exactly where to put the thing.
My property is 188'x350' with a 10' "utility,postal,drainage' easement around the entire perimeter. I just got off the phone with the city folks and they believe because every plot near me has the same cookie cutter easement (they've never seen a "postal" easement, nor have I) that it was done to cover all possibilities. However they were right to remind me that if someone in those departments wants to, they have the right to do what they need include digging up my base material if they need to and won't necessarily put it back the way they found it.
I also have a septic leach field I need to account for on the other side of the proposed building area.
How far should I stay away from either of these "lines"? I was planning on giving myself a few feet of wiggle room for the easement line but how much room do i need to give myself between the building and the septic field? is it OK to have the fill material over it, or is any sort of top cover a no no?
I'd like to build as close to the easement as possible without setting myself up for problems later on down the road.
My property is 188'x350' with a 10' "utility,postal,drainage' easement around the entire perimeter. I just got off the phone with the city folks and they believe because every plot near me has the same cookie cutter easement (they've never seen a "postal" easement, nor have I) that it was done to cover all possibilities. However they were right to remind me that if someone in those departments wants to, they have the right to do what they need include digging up my base material if they need to and won't necessarily put it back the way they found it.
I also have a septic leach field I need to account for on the other side of the proposed building area.
How far should I stay away from either of these "lines"? I was planning on giving myself a few feet of wiggle room for the easement line but how much room do i need to give myself between the building and the septic field? is it OK to have the fill material over it, or is any sort of top cover a no no?
I'd like to build as close to the easement as possible without setting myself up for problems later on down the road.