I don't know that much about electrical but some of the things I'm seeing in my house just don't seem right at all. First, I have a 200 amp service but I see 480 amps of breakers in the box. 100amps for a subpanel and 50 amps for a second subpanel in the shed. Isn't this way overloaded? I know that it's supposed to be a load test rather than simply adding them up but there are quite a few tandems. Second, I need to reroute two circuits to prepare for the relocation of the panel. Both these circuits are fed from one run of romex which goes to a junction box in the attic where it splits off. Obviously they share a neutral. Is that OK or should I run 2 separate runs of romex when rerouting. Finally, when I relocate these circuits it would be easier to feed them from the 100amp subpanel than take them back to the main panel but that would result in a total of 145 amps out of a 100amp panel. Granted 40amps are feeding this ridiculous heated shower waterfall that we never use but it's still there. The 100 amp subpanel is fed by #2 wire over about a 75' run and I'm wondering if it will support a larger subpanel.
This is not my handywork so please don't shoot the messenger.
This is not my handywork so please don't shoot the messenger.