BlackLead
Well-known member
I'm looking at installing vinyl siding on my garage soon. I've done this before, before the garage was enlarged, but now I'm looking at doing this before any of the exterior outlet/light boxes or hose bibs are installed, primarily due to the fact that I've got the materials for the siding, but haven't found the fundage for the electrical or plumbing rough-in yet. Which brings me to the question: do I need to locate and install junction/outlet boxes in the exterior sheathing before I install the vinyl, or will I be good with locating the trim rings only at this point, and coming back later to install the penetrations at rough-in? If I need to install the outlet and junction boxes prior, what is the correct way to do this? Should the face of the box fit flush with the sheathing, or come thru a bit? Any insights would be very much appreciated.
