I'm renting a space from a friend in a pretty old building (40s or earlier) with concrete slab floors. I've been in there for a year now, and am just getting the electrical sorted and installing my 4-post storage lifts and a 2-post service lift. Today, when setting a post on the 2-post lift, I over drilled the last (5th) hole and went through the slab - and discovered a void of about 8" below the slab. I pushed a wooden dowel down into it and was able to sink it another 20" or so into the soft soil, and the last 6" of the dowel absorbed moisture.
Previously, I'd learned from a neighbor that this property had historical flooding issues at the loading dock area (it's a dug-in style dock), but the city apparently resolved all those drainage issues a few years back. I suspect this is what has undermined the slab over time.
The slab seems pretty stout; there's no weird cracking or settling anywhere in the building, and I wouldn't have known had I not over drilled the one hole.
Is this repairable/reinforceable with mudjacking techniques? I have the space slammed full, and emptying it isn't a real option (I have two years left on my lease with a 1-2 year optional renewal; this is a temporary space while building a permanent future location elsewhere), so I'd love to shore it up if possible and get on with work/business.
Thoughts? Can it be as simple as hiring a firm to come and inject slurry into the void?
Previously, I'd learned from a neighbor that this property had historical flooding issues at the loading dock area (it's a dug-in style dock), but the city apparently resolved all those drainage issues a few years back. I suspect this is what has undermined the slab over time.
The slab seems pretty stout; there's no weird cracking or settling anywhere in the building, and I wouldn't have known had I not over drilled the one hole.
Is this repairable/reinforceable with mudjacking techniques? I have the space slammed full, and emptying it isn't a real option (I have two years left on my lease with a 1-2 year optional renewal; this is a temporary space while building a permanent future location elsewhere), so I'd love to shore it up if possible and get on with work/business.
Thoughts? Can it be as simple as hiring a firm to come and inject slurry into the void?