acer66
Well-known member
The latest wafer LEDs thread got me thinking.
I wanted to install wafers in my remodel which was partly a tear down so there was new framing where I wanted to put them.
I asked the inspector and he said he would not sign off the rough in because of the “loose end” wires so I put in the cans.
NEC 2014 was in effect.
Was he right?
Thank you.
I wanted to install wafers in my remodel which was partly a tear down so there was new framing where I wanted to put them.
I asked the inspector and he said he would not sign off the rough in because of the “loose end” wires so I put in the cans.
NEC 2014 was in effect.
Was he right?
Thank you.