Good morning,
I’m trying to figure out how to allow my walls to dry to the interior in a bathroom where I plan to finish the walls with something like tile that will form a moisture barrier. Located in central Texas.
The exterior walls are sheet metal with a rain screen, Tyvek, taped foil-faced polyiso foam, over 3/4 plywood. As such, the will be no drying to the exterior.
I vaguely recall, hearing stories about schools putting up whiteboards (or black boards) on the wall and ending up with mold on the back side because of trapped moisture in the wall. I can see a similar situation if I put concrete board and tile up on an interior wall in the bathroom area.
Is there a traditional way to avoid this? I can get a little creative and put some type of self ventilating system with perforations top and bottom on the wall to allow airflow behind the tile. Or I can abandon my ideas of using moisture barrier like hard tile and instead finish off the bathroom walls with something like shiplap.
Thanks
I’m trying to figure out how to allow my walls to dry to the interior in a bathroom where I plan to finish the walls with something like tile that will form a moisture barrier. Located in central Texas.
The exterior walls are sheet metal with a rain screen, Tyvek, taped foil-faced polyiso foam, over 3/4 plywood. As such, the will be no drying to the exterior.
I vaguely recall, hearing stories about schools putting up whiteboards (or black boards) on the wall and ending up with mold on the back side because of trapped moisture in the wall. I can see a similar situation if I put concrete board and tile up on an interior wall in the bathroom area.
Is there a traditional way to avoid this? I can get a little creative and put some type of self ventilating system with perforations top and bottom on the wall to allow airflow behind the tile. Or I can abandon my ideas of using moisture barrier like hard tile and instead finish off the bathroom walls with something like shiplap.
Thanks