I'm putting the Epoxy Shield on my garage floor. Yesterday I spent the day degreasing all the spots that needed it and I used the concrete etching on the rest of the floor. I rinsed the floor down real good and squeegeed all the excess water. It's now been 24 hours and the floor still looks a little damp in some spots. Should I give it more time to dry or is it Ok to put the Epoxy on the damp floor, does the floor need to be completely dry? Should I give it another day to be sure it's dry?
Last edited:
