Hello all
I need to run about 30 feet of drain line and water supply lines under my garage floor before I concrete. I have two questions should I use schedule 40 pipe or 80? Also whats the best way to backfill sand, rock, just dirt?
I need to run about 30 feet of drain line and water supply lines under my garage floor before I concrete. I have two questions should I use schedule 40 pipe or 80? Also whats the best way to backfill sand, rock, just dirt?