Diesel Dan
Well-known member
This is a new construction slab just under 40' x 72', 4-5" thick, 3500 psi, hard troweled finish on 10 mill plastic barrier. Will be a working shop exposed to petroleum products, rolling heavy equipment, dropping transmissions etc.
Questions on timing for curing/sealing.
Once poured I plan to water (pond, flood) cure the slab.
After water curing for 7 days the slab should be 50% stronger, will a spray on densifier/sealer do much more to toughen the surface?
When to apply densifier, before or after water curing?
Do I flood the slab right after the final finishing is done or wait ** amount of time?
Questions on timing for curing/sealing.
Once poured I plan to water (pond, flood) cure the slab.
After water curing for 7 days the slab should be 50% stronger, will a spray on densifier/sealer do much more to toughen the surface?
When to apply densifier, before or after water curing?
Do I flood the slab right after the final finishing is done or wait ** amount of time?