To avoid these ads, REGISTER NOW!

Wayyy behind schedule, but...

Ryan

Administrator
Staff member
Joined
Jan 26, 2006
Messages
5,765
Location
Boulder/Koloa
The redesign and move to Xenforo is way behind schedule, but I'm soldering on. I shouldn't be giving sneak peeks, but I need to in order to keep my self accountable if that makes sense...

Anyway, coming... some day... hopefully soonish... Hard to say as there is still lots of dev work to do.

Oh. And this is very rough draft of a header...

Ryan
 

Attachments

  • rough.jpg
    rough.jpg
    114.5 KB · Views: 541
To avoid these ads, REGISTER NOW!

Kev442

Well-known member
Joined
Jan 15, 2009
Messages
5,386
Location
Wi
Hmmm, on the GJ, soldering on is probably more on point than Soldiering!
 

Falcon67

Well-known member
Joined
Jun 11, 2009
Messages
18,371
Location
Merkel, TX
Nothing is ever easy and everything takes twice the time and 3 times he money.

The first 80% of a project takes 90% of the time, the remaining 20% takes the other 90%.

Truth. Nice looking header, like the color scheme.
 
To avoid these ads, REGISTER NOW!

Dan in Pasadena

Well-known member
Joined
Feb 18, 2009
Messages
13,268
Location
Pasadena, CA
I like it too, but is it ok to ask, WHY was it necessary to do this? Besides appearance, what will users or moderators gain by this effort? No criticism, your site of course you can do what you want. Just wondering.
 

rharman

Well-known member
Joined
Apr 22, 2012
Messages
9,118
Location
SoCal
I like it too, but is it ok to ask, WHY was it necessary to do this? Besides appearance, what will users or moderators gain by this effort? No criticism, your site of course you can do what you want. Just wondering.

Xenforo is a much better platform than vBulletin.
 

Worsedog

Well-known member
Joined
Mar 2, 2008
Messages
1,524
Location
Central FL
The redesign and move to Xenforo is way behind schedule, but I'm soldering on. I shouldn't be giving sneak peeks, but I need to in order to keep my self accountable if that makes sense...

Anyway, coming... some day... hopefully soonish... Hard to say as there is still lots of dev work to do.

Oh. And this is very rough draft of a header...

Ryan

Looks pretty slick Ryan.

Now from the incorrigible smart *** in me: Perhaps if you were soldiering rather than soldering it would go faster. :headscrat
 
To avoid these ads, REGISTER NOW!
Top Bottom