Have a question for you guys. Came across several 12’ pieces of c-channel from a job. This winter would like to work on making a 30’ I-beam out of some of them to be used on a patio overhang.
Would weld the c-channels back to back making an I-beam out of them. I would stagger the joints at 6’ intervals.
Anyone see a big problem with this? Solid weld on top and bottom.
Thanks guy’s appreciate the input
Would weld the c-channels back to back making an I-beam out of them. I would stagger the joints at 6’ intervals.
Anyone see a big problem with this? Solid weld on top and bottom.