Due to material costs I have elected to change my shop from wood framed to block. Currently it’s a 4’ high block stem wall that last year I wetset j bolt anchors in preparation for framing on. I just took delivery on my block and rebar and will begin the process of laying block the rest of the way up for my walls.
My original thought was I needed to drill and epoxy vertical rebar in the top bond beam course. Then I thought, wait, what if I just weld the rebar to my j bolts? They are set probably 4-6” in the course and stick up another 3-4”. I could place th e rebar next to the protruding anchor bolts and weld a bead on each side. Thoughts?
My original thought was I needed to drill and epoxy vertical rebar in the top bond beam course. Then I thought, wait, what if I just weld the rebar to my j bolts? They are set probably 4-6” in the course and stick up another 3-4”. I could place th e rebar next to the protruding anchor bolts and weld a bead on each side. Thoughts?