This is for a subpanel to feed pool equipment.
Heat pump - 240v, 42.1a minimum circuit ampacity, 60a max breaker
Pump - 1.8hp variable speed. Dual voltage, assume 240v
Salt chlorinator - 2a, 120v
Service outlet - 15a? 120v
Feed to pool shed - 20a MWBC
Whenever the HP is running, the pump will also be running. The service outlet will almost never get used, but even if it does, I'd expect minimal load. I don't have anything really heavy draw that will go in the shed, other than a EGO battery charger (750w) and a mini fridge.
Feels to me like 80-90a would be prudent.
An electrician is doing the work, I just want to be know what to expect/push for, if needed. Everything is standard to their work except the shed wiring
Heat pump - 240v, 42.1a minimum circuit ampacity, 60a max breaker
Pump - 1.8hp variable speed. Dual voltage, assume 240v
Salt chlorinator - 2a, 120v
Service outlet - 15a? 120v
Feed to pool shed - 20a MWBC
Whenever the HP is running, the pump will also be running. The service outlet will almost never get used, but even if it does, I'd expect minimal load. I don't have anything really heavy draw that will go in the shed, other than a EGO battery charger (750w) and a mini fridge.
Feels to me like 80-90a would be prudent.
An electrician is doing the work, I just want to be know what to expect/push for, if needed. Everything is standard to their work except the shed wiring