GarageEnvy
Well-known member
In preparing for the new garage I have to demo my old one. As part of that deal I need to move my existing service panel and obviously set up temporary power. I have a couple of options. Option A involves simply swinging all circuits to a temporary location along the attached wall to the house and then moving them again to the permanent location along the rear wall of the garage. Advantage, fairly simple, least expensive and probably won't be w/o power for more than a day. Option 2 is to permanently mount a subpanel on the attached wall to the house and then run temporary power via a single feed line to temporary power meter box on same wall. Later service panel could be located further along the rear wall toward my shop. The advantage is that it chops about 30' off all the household circuits, positions the main service panel in the shop area, moves the overheard drop further out of sight and since there would only be the one line feeding the subpanel with all the circuits and a second feeding a subpanel for pool equipment the remainder of the box would be wide open for garage circuits. It also permanently gets the existing circuit wires out of the weather and harms way during construction. Downside is it costs a bit more and I might be out of power for two days.